Project Scope
PROJECT: Office Building 5001, 4900 SW 30 Rd. Gainesville, Florida 32608 |
CENTRIA DSM: Wesley Ford |
MAIN ARCHITECT: Cupkovic Architecture, LLC Cleveland, OH 216.524.8400 |
ADDITIONAL ARCHITECT(S): TLC Engineering for Architecture Orlando, FL |
GENERAL CONTRACTOR: HOAR Construction Orlando, FL |
CENTRIA DEALER: FIVE-T-CO , Sarasota, FL Parke Tucker, 941.650.9274 |
INSTALLER: FIVE-T-CO, Sarasota Jud Tucker, 941.650.7789 |
BUILDING OWNER: Celebration Point Holdings, LLC Gainesville, Florida |
COMPLETION DATE: 2/23/2018 | RETROFIT (Y/N): No |
BUILDING’S END USE (Type): Office Building |
PROJECT CHALLENGES OR REQUIREMENTS: Advanced application of Insulated Metal Wall Panels |
LEED CERTIFIED (Type): Silver |
Material Used
CENTRIA PRODUCTS:
FWDS 36” x 2.5”Gauge: 22/22
Color: #9919 Fashion Gray
Finish: Smooth
Coating: Fluorofinish
SQ. Feet: 10,200
FWDS 36” x 2.5”
Gauge: 22/22
Color: #9919 Fashion Gray
Finish: Smooth
Coating: Fluorofinish
SQ. Feet: 10,250