Building 5001, Gainesville, Florida

Project Scope

 

PROJECT:
Office Building 5001,
4900 SW 30 Rd.
Gainesville, Florida 32608
CENTRIA DSM:
Wesley Ford
MAIN ARCHITECT:
Cupkovic Architecture, LLC
Cleveland, OH
216.524.8400
ADDITIONAL ARCHITECT(S):
TLC Engineering for Architecture
Orlando, FL
GENERAL CONTRACTOR:
HOAR Construction Orlando, FL
CENTRIA DEALER:
FIVE-T-CO , Sarasota, FL
Parke Tucker, 941.650.9274
INSTALLER:
FIVE-T-CO, Sarasota
Jud Tucker,  941.650.7789
BUILDING OWNER:
Celebration Point Holdings, LLC
Gainesville, Florida
COMPLETION DATE: 2/23/2018 RETROFIT (Y/N): No
BUILDING’S END USE (Type):
Office Building
PROJECT CHALLENGES OR REQUIREMENTS:
Advanced application of Insulated Metal Wall Panels
LEED CERTIFIED (Type): Silver
Material Used


CENTRIA PRODUCTS:

FWDS 36” x 2.5”

Gauge: 22/22

Color: #9919 Fashion Gray

Finish: Smooth

Coating: Fluorofinish

SQ. Feet: 10,200


FWDS 36” x 2.5”

Gauge: 22/22

Color: #9919 Fashion Gray

Finish: Smooth

Coating: Fluorofinish

SQ. Feet: 10,250


Back to Projects

About 5tco

5tco is the CENTRIA Dealer and a premier subcontractor of architectural metal wall panel systems used in commercial, industrial, and the non-residential markets.

More

Follow Us